Preparatory Works/Checks

  • Checks that the vessel top's deviation from the level does not exceed 0.87mm/M
  • Make that the holding point is above the center of gravity-harzard of overturning
  • With motors : Attach an additional rope to the motor.
  • Position the two wooden beams on both sides of the shaft, insert the bolts and tighten the nuts so that there will begaps os appox. 1 cm between the shaft and the beams.